This information is provided to make sure you are aware of inspection requirements and to help you avoid delays in your project. Remember, after you apply for a permit a representative of Macon County Building Department has the right to visit your proposed site and/or property prior to issuing the permit. Thank you!

Please Make Note of these Requirements.

SETBACKS: [THE DISTANCES FROM PROPERTY LINES AND ROAD RIGHT-OF-WAY]

Your home or building must be constructed at certain distances from the property lines front and rear and both sides. Reference County Zoning Ordinance or contact Building Inspector for additional information

ROAD RIGHT-OF-WAY

The right-of-way distance varies from road to road. If you are unsure or have questions, please contact either the Building Inspector’s or County Commission Office.

SEPTIC TANK

To obtain a building permit you must furnish a copy of the septic tank permit. Septic tank permits and inspections are controlled by the Health Department. If you use an existing septic tank you still must have it inspected by the Health Department. It’s important to get your tank installed as soon as possible as final electric power will not be authorized until your septic system is installed and approved by the Health Department.

LICENSED CONTRACTORS

A property owner may perform their own work; however, if you have someone else performing work for you, the person must have the appropriate state license. i.e., licensed electrician, licensed plumber, or mechanical licensed {heating and air}.

REQUIRED PERMITS

The following permits are required:

NO INSPECTION WILL BE DONE UNTIL EACH PERMIT HAS BEEN OBTAINED.

REQUEST FOR INSPECTION

 Requests for inspection must be made one working day in advance, i.e., days’ notice must be given. Inspections are not made on weekends or holidays. Call the Macon County Building Department at (478) 472-7023 to schedule Inspections.

REQUIRED INSPECTIONS

The following inspections are required:

SPECIAL ELECTRICAL INSPECTION

If final power is needed in order to work inside during inclement weather only you may apply for a special electrical inspection and the Building Inspector will determine if it’s safe for power to be turned on prior to final inspection.  This has to be requested in writing to the Macon County Building Department.

MONOLITHIC SLAB

On a monolithic slab you must have 4 inches of gravel to allow for earth expansion. This slab must be inspected before any concrete is poured.

FOOTER

All footers must be inspected prior to pouring and must meet the weight and height requirement of the building.  

TERMITE LETTER

The foundation on all homes must be treated for termites.  A letter of treatment must be presented before CO will be issued  for the building.

PLEASE NOTE:  It is the intent of Macon County Board of Commissioners and Macon Country Building Department to enforce the latest edition of the following mandatory Georgia State Minimum Standard Codes, as adopted and amended by the Georgia Department of Community Affairs.